Austin › contractor

Air Craft Inc. Air Conditioning, Refrige

52 permits on record in Austin (2025-09-25 → 2026-10-16)

Rank in Austin

HVAC & Mechanical#23 of 194 (30 days, 7 permits)#39 of 825 (12 months, 47)

Permits per month, last 12 months

11
12
01
02
03
04
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-16HVAC & Mechanical500 PAMPA DRInterior Renovation to accommodate Temporary OfficesActive ↗
2026-10-02HVAC & Mechanical835 W 6TH ST UNIT 1000Interior Remodel - Game Testing Coffee Bar and Game Observation Room.Active ↗
2026-10-02HVAC & Mechanical835 W 6TH ST UNIT 1000Interior Remodel - The Unisex Restroom will remain available while the Men & Ladies Room are under construction. Once they are completed theActive ↗
2026-10-02HVAC & Mechanical835 W 6TH ST UNIT 1000Interior Remodel - 2 Conference Room Parents Lounge Reception Townhall Break Out Area and Open Office Areas.Active ↗
2026-10-02HVAC & Mechanical835 W 6TH ST UNIT 1100Interior Remodel - Restrooms - The Unisex Restroom will remain available while the Men & Ladies Room are under Construction. Once they are cActive ↗
2026-10-02HVAC & Mechanical835 W 6TH ST UNIT 1100Interior Remodel - Office Area Open Office Areas and Breakout Area.Active ↗
2026-10-01HVAC & Mechanical11400 N MOPAC EXPY SVRD SBCHANGE OF USE CHURCH TO PRIVATE SCHOOL-conversion of existing Christian life center to become middle schoolActive ↗
2026-09-16HVAC & Mechanical5920 W WILLIAM CANNON DR BLDG 1 UNIT 100Interior renovation of existing office space B occupancy. Removal of existing wall partitions doors frames. Removal of existing ceiling tileActive ↗
2026-08-28HVAC & Mechanical6200 BRIDGE POINT PKWY BLDG 4 UNIT 300INTERIOR REMODEL new finishes ceilings and lighting and the building out of new office spaceFinal ↗
2026-08-25HVAC & Mechanical2020 W ANDERSON LN UNIT 100Replacement of any self-contained packaged units Replacement of 1x 7.5-Ton RTU and 1x 10-Ton RTU (Like for like systems) at Four Hands OutleActive ↗
2026-08-25HVAC & Mechanical4401 FREIDRICH LN BLDG 4Replacement of any self-contained packaged units Replacement of 1x like-for-like 7.5 Ton RTUActive ↗
2026-08-05HVAC & Mechanical11110 METRIC BLVD UNIT EReplacement of any self-contained packaged units Replacement of 2x 12.5 Ton RTUs (Like for like no curb adaptors) at Apparent Technologies.Active ↗
2026-08-04HVAC & Mechanical601 W BRAKER LN BLDG 1Change of Use from Religious Assembly to Admin/Bus Office with minor interior remodel. 2026-012346 DAFinal ↗
2026-07-09HVAC & Mechanical11525 STONEHOLLOW DR UNIT 125Replacement of any self-contained packaged units Replacement of (1) like-for-like 3-Ton RTU at Build A Sign.Active ↗
2026-06-18HVAC & Mechanical1835 KRAMER LN BLDG A UNIT 100Replacement of any self-contained packaged units Replacement of 1x 7.5 Ton RTU at 1835A Kramer Lane Suite 100. This is not a duplicate permiFinal ↗
2026-06-18HVAC & Mechanical12617 RIDGELINE BLVD BLDG CReplacement of any self-contained packaged units Replacement of 2x like-for-like Lennox 7.5 Ton rooftop units at Champion Performance.Active ↗
2026-06-18HVAC & Mechanical4616 W HOWARD LN BLDG 5 UNIT 550Replacement of any self-contained packaged units Replacement of 1x like-for-like 17.5-Ton RTU.Active ↗
2026-05-26HVAC & Mechanical3201 WINDSOR RDReplacement of any self-contained packaged units Replacement of 5x like-for-like rooftop units. The units are 2x 3-Tons 2x 5-Tons and 1x 7.5Final ↗
2026-04-15HVAC & Mechanical2401 PEARL STInterior renovation to the existing kitchen serving the residential facility along with the replacement of the grease interceptor. Scope incFinal ↗
2026-03-17HVAC & Mechanical10025 ALTERRA PKWY UNIT 100Initial tenant improvement of first-level suite to create B occupancy office space with meeting rooms employee break room and open office.Final ↗
2026-02-17HVAC & Mechanical1514 ED BLUESTEIN BLVD SB UNIT 101Replacement of any self-contained packaged units only (like for like)Final ↗
2026-02-03HVAC & Mechanical10025 ALTERRA PKWY UNIT 1500First Time Finish-Out for Admin Office - Suite 1500Final ↗
2026-01-21HVAC & Mechanical7301 METRO CENTER DR BLDG 15 UNIT 150ePlan: Commercial Expedited Review- First Time Finish out from Warehouse Shell to Office Warehouse (41770 SF)Final ↗
2026-01-12HVAC & Mechanical8200 CAMERON RD UNIT 162Replacement of any self-contained packaged units Replacement of 1x Split System for Rotech Health Care.Final ↗
2025-12-19HVAC & Mechanical10500 N IH 35 SVRD SB BLDG AChange of Use of an existing 2 story 13337sq ft warehouse to a 2853 sq ft commercial Office and 10484 sq ft open parking.Final ↗