Austin › contractor

Calixto Plumbing

76 permits on record in Austin (2025-09-03 → 2026-10-22)

Rank in Austin

Plumbing#37 of 267 (30 days, 5 permits)#32 of 959 (12 months, 72)

Permits per month, last 12 months

10
11
12
01
02
03
04
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-22Plumbing4108 CIRCLETREE LOOPTunnel under foundation to replace 120 feet of cast iron for 3 full bathrooms kitchen and washer drain. There will be 2 access holes one in Active ↗
2026-10-20Plumbing2604 CAVILEER AVEReplace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet and will cross uner drivewayActive ↗
2026-10-15Plumbing5810 GATESHEAD DRTunnel under foundation to remove cast iron drain lines for 2 full bathrooms kitchen and washer. Drain line approx. 70 ft. Two access holes:Final ↗
2026-10-14Plumbing1007 PAYNE AVEReplace sewer line from home to city tap connection. Total length of sewer line approximately 55 feet.Final ↗
2026-10-14Plumbing7708 TISDALE DRTunnel under foundation to replace cast iron drain lines for 1 full bathroom with kitchen and washer. Total of 2 access holes one in the bacActive ↗
2026-09-23Plumbing2501 DOUGLAS STReplace main sewer line from the home to the city tap connection total length of sewer line is approximately 53 feet long.Final ↗
2026-09-22Plumbing2602 CAVILEER AVEReplace water line from meter to the home a total of 40 feet. Replace water lines under the foundation of pier and beam home for 2 full bathFinal ↗
2026-09-15Plumbing5609 WESTMINSTER DRTunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drains only. 3 access holes will be made oFinal ↗
2026-09-15Plumbing5904 SPARTAN CVCreate a access hole by the hall bathroom 2 foot by 2 foot hole will be made and tunnel under 12 to 15 feet to correct fall on the main draiFinal ↗
2026-09-08Plumbing10600 HARD ROCK RDRepipe main water line from the home to the city tap connection repipe -interior as wellFinal ↗
2026-09-07Plumbing3019 E 13TH STRepipe main water line from the meter to the home approximate length is 25 feet.Final ↗
2026-09-03Plumbing4006 NORTH HILLS DRTunnel under foundation to replace cast iron drain lines for primary bathroom and hall bathroom only. Two access holes: one on right side ofFinal ↗
2026-09-01Plumbing3135 EANES CIRInterior (only) renovation of a 1980 built residential home in BeeCave Woods. Renovation includes modification upgrades to the original inteActive ↗
2026-08-31Plumbing4214 FAR WEST BLVDePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2bath] Work to include: First floor Active ↗
2026-08-31Plumbing5601 S OAK BLVDRepipe drain lines for 2 full bathrooms kitchen and washer under pier and beam foundation total length of drain line is approximately 40 feeFinal ↗
2026-08-18Plumbing1508 ELTON LNReplace galvanized water lines for one full bathroom kitchen and washer u Der pier and beam home. Water lines will be replaced with pex mateFinal ↗
2026-08-06Plumbing5115 CREEKLINE DRTunnel under foundation to replace cast irons drain lines for 2 full bathrooms kitchen and washer drain line. Total length of tunnel is apprFinal ↗
2026-07-29Plumbing4107 CIRCLETREE LOOPTunnel under foundation to replace cast iron drain lines for 2 full bathrooms a half bathroom kitchen and washer drain line. approximately 1Active ↗
2026-07-22Plumbing2205 LARAMIE TRLTunnel under foundation to replace cast iron drains for primary bathroom 1/2 bathroom and kitchen with washer drain line as well. Total lengFinal ↗
2026-07-16Plumbing3009 VAL DRSewer line replacement from the home to the city tap connection. Total length of sewer line is approximately 80 feet longFinal ↗
2026-07-15Plumbing4700 CAT MOUNTAIN DRePlan: Residential Expedited Review - Addition and Remodel to Existing Single Family Res. work to include interior remodel vault kitchen ceiActive ↗
2026-07-14Plumbing4208 NORTH HILLS DRReplace sewer line from the home to the city tap connection total length of sewer line is approximately 40 feet.Final ↗
2026-07-09Plumbing2302 WHITESTONE DRTunnel under foundation to replace cast iron drain lines for 2 full bathrooms kitchen and washer drain lines. 2 access holes will be made onFinal ↗
2026-07-08Plumbing1519 W 29TH STReplace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet.Final ↗
2026-07-03Plumbing1410 KAMAR DRTunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drain line. Kitchen and washer drain line Final ↗