Austin › contractor
DeLeon's Plumbing
93 permits on record in Austin (2025-09-01 → 2026-10-05)
Rank in Austin
| Plumbing | #87 of 267 (30 days, 2 permits) | #26 of 959 (12 months, 82) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-05 | Plumbing | 5705 SAM HOUSTON CIR | Express - Exterior Paint Hardwood floors New Tankless gas water heater. | Final ↗ |
| 2026-09-26 | Plumbing | 1806 STAMFORD LN | Gas test gas was turn off and customer need gas test | Final ↗ |
| 2026-09-23 | Plumbing | 500 W ST JOHNS AVE BLDG 2 | New 2nd unit | Active ↗ |
| 2026-09-09 | Plumbing | 4203 FAR WEST BLVD | Add cased openings within the center wall on the first level into the living room and pantry. Expand the pantry for more cabinets. Add a was | Active ↗ |
| 2026-09-07 | Plumbing | 2603 E 14TH ST | Total demo of sfr 936 sqft circa 1900 | Final ↗ |
| 2026-09-07 | Plumbing | 1181 RIDGEWAY DR | Total demo of 1224 SqFt SFR circa 1940 | Final ↗ |
| 2026-09-06 | Plumbing | 6109 GINITA LN | Kitchen remodel including removal of some interior non load bearing walls. | Active ↗ |
| 2026-08-30 | Plumbing | 2811 E 22ND ST BLDG 3 | Bldg. 3 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered bal | Active ↗ |
| 2026-08-25 | Plumbing | 2811 E 22ND ST BLDG 1 | Bldg. 1 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered bal | Active ↗ |
| 2026-08-25 | Plumbing | 2811 E 22ND ST BLDG 2 | Bldg. 2 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered bal | Active ↗ |
| 2026-08-12 | Plumbing | 1176 RIDGEWAY DR | Replace sewer line under pr been house shower drain and valve and replace kl | Final ↗ |
| 2026-08-04 | Plumbing | 3202 WESTERN DR | *Partial Demo* Interior remodel Bathroom remodel to add tub and refresh master suite. | Final ↗ |
| 2026-07-23 | Plumbing | 4204 AVENUE H | Expedited Review: Addition and Remodel of Existing 1-Story Single Family Res [3bed 3.5bath]. Work to include Reconstruct Front Porch and New | Active ↗ |
| 2026-07-23 | Plumbing | 4204 AVENUE H | New detached garage/carport | Active ↗ |
| 2026-07-09 | Plumbing | 2109 DORIS DR | New 2 Story Secondary Dwelling with covered porch 1/1 | Active ↗ |
| 2026-07-04 | Plumbing | 937 E 53RD ST | BLDG 1: 3 stroy SFR with 4 bedrooms 3 bath covered patio an attached carport. | Active ↗ |
| 2026-07-04 | Plumbing | 937 E 53RD ST | BLDG 2: 3 stroy SFR with 4 bedrooms 3 bath covered patio an attached carport. | Active ↗ |
| 2026-07-04 | Plumbing | 937 E 53RD ST | BLDG 3: 3 stroy SFR with 4 bedrooms 3 bath covered patio an attached carport. | Active ↗ |
| 2026-06-29 | Plumbing | 5911 SHERIDAN AVE UNIT B112 | Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equi | Final ↗ |
| 2026-06-26 | Plumbing | 12705 POQUOSON DR BLDG 2 | New construction 2-unit use single-family residential 1-story 1 bedroom 1 bath with covered front porch. | Active ↗ |
| 2026-06-23 | Plumbing | 5911 SHERIDAN AVE UNIT B105 | Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equi | Final ↗ |
| 2026-06-23 | Plumbing | 5911 SHERIDAN AVE UNIT B106 | Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equi | Final ↗ |
| 2026-06-23 | Plumbing | 5911 SHERIDAN AVE UNIT B108 | Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equi | Final ↗ |
| 2026-06-23 | Plumbing | 5911 SHERIDAN AVE UNIT B111 | Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equi | Final ↗ |
| 2026-06-17 | Plumbing | 7000 JOHNNY MORRIS RD BLDG 3 | ePlan: Commercial Expedited Review - New Construction of 3 Shell Buildings with Mezzanine (13429 SF). | Active ↗ |