Austin › contractor

Freedom Solar Power

105 permits on record in Austin (2025-09-16 → 2026-10-23)

Rank in Austin

Electrical#41 of 333 (30 days, 5 permits)#18 of 1218 (12 months, 92)
Solar & Storageno permits in last 30 days#3 of 19 (12 months, 8)
General & Remodelno permits in last 30 days#1044 of 2443 (12 months, 1)

Permits per month, last 12 months

11
01
02
03
04
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-23Electrical15925 NARCISSUS WAYDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Active ↗
2026-10-13Electrical4515 MAGIN MEADOW DRInstall new 9.57kw rooftop solar system for existing residential only.Active ↗
2026-10-08Electrical10206 LA COSTA DRInstall new 13.5kw energy storage system & replacement of 1 energy storage system with second 13.5kW ess for existing residential only.Active ↗
2026-10-08Electrical5603 FORKS RDInstall new 6.525kW rooftop solar system for existing residential only.Active ↗
2026-10-06Electrical7109 GENTLE OAK DRInstall new 7.37kw rooftop solar system and 13.5kw energy storage system for existing residential onlyActive ↗
2026-09-25Electrical1021 E 43RD STPH2: Install additional new 5.1kW rooftop solar system for existing residential only.Active ↗
2026-09-25Electrical915 W JOHANNA STInstall new 12.035kW rooftop solar system for existing residential only.Active ↗
2026-09-25Electrical7109 GENTLE OAK DRDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Active ↗
2026-09-18Electrical10305 TILDON AVEPH2 Install new 3.045 kw rooftop solar system for existing residential only.Active ↗
2026-09-17Electrical3514 MALONE DRDisconnect/reconnect to install new utility meter. We are not upgrading the size of the service not upgrading the meter size.Active ↗
2026-09-10Electrical2303 MANANA STETJ Upgrade Disconnect/reconnect to install NEW REVENUE METER AND INSTALL (2) NEW ATS BETWEEN THE NEW REVENUE METER & THE MDPS No installatiActive ↗
2026-09-10Electrical3514 MALONE DRInstall new 5.81kw rooftop solar system for existing residential only.Active ↗
2026-09-09Electrical3104 PLEASANT RUN PLPrewire permit for solar project.Active ↗
2026-09-01Electrical7016 VIA DONO DRInstall additional pv components. We are not upgrading the size of the service not upgrading the meter size.Active ↗
2026-08-27Electrical9421 SHADY OAKS DRPH2 Install new 2.289kw rooftop solar system for existing residential only.Final ↗
2026-08-26Electrical15108 LARIAT TRLDisconnect/reconnect to repair pv/ESS components. AE meter tag required to be cut for SOW. We are not upgrading the size of the service not Active ↗
2026-08-25Electrical10254 MISSEL THRUSH DRInstall new 4.3kW rooftop solar system for existing residential only.Final ↗
2026-08-25Electrical7806 PACES MILL LNInstall new 17.2kW rooftop solar system for existing residential only.Active ↗
2026-08-25Electrical10254 MISSEL THRUSH DRDisconnect/reconnect to install new 200a utility meter and upgrade main distribution panel.Final ↗
2026-08-24Electrical7806 PACES MILL LNDisconnect/reconnect to repair pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Active ↗
2026-08-20Electrical4633 FAR WEST BLVD UNIT 2Install new 11.2kW rooftop solar system for existing residential only.Active ↗
2026-08-20Electrical5406 PENDLETON LNInstall new 9.775kW rooftop solar system for existing residential only.Final ↗
2026-08-14Electrical15108 LARIAT TRLDisconnect/reconnect to repair pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Withdrawn ↗
2026-08-13Electrical9901 SALVIA CVAux permit for the energy storage. Disconnect permit on 2026-075874 EP Disconnect/reconnect to tie in ESS components. We are not upgrading tFinal ↗
2026-08-13Electrical4633 FAR WEST BLVD UNIT 6Install new 3.50 kw rooftop solar system for existing residential only.Active ↗