Austin › contractor

G Creek INC.***MAIN***

11 permits on record in Austin (2025-09-23 → 2026-09-14)

Rank in Austin

General & Remodelno permits in last 30 days#231 of 2443 (12 months, 7)
Electricalno permits in last 30 days#790 of 1218 (12 months, 1)
Roofingno permits in last 30 days#43 of 171 (12 months, 1)

Permits per month, last 12 months

12
02
05
07
09

Recent permits

IssuedTradeAddressWorkStatus
2026-09-14General & Remodel3001 PALM WAY UNIT 100INTERIOR REMODEL TO SPLIT EXISTING BANK SPACE #108 INTO TWO SPACES #100 and #108 AND RETURN TO SHELL.Active ↗
2026-09-14General & Remodel3001 PALM WAY UNIT 108INTERIOR REMODEL TO SPLIT EXISTING BANK SPACE #108 INTO TWO SPACES #100 and #108 AND RETURN TO SHELL.Active ↗
2026-07-30Roofing4800 CONVICT HILL RDRoof replacement and renovations to existing sanctuary to accommodate installation of new HVAC equipment.Active ↗
2026-07-21General & Remodel2307 EUCLID AVENew three-story office building demolition of some sidewalks. driveway courtyard area where new building is to be constructedActive ↗
2026-05-28General & Remodel1600 CONGRESS AVEInstall new 28x14 elevated deck. Deck is elevated 14Active ↗
2026-05-11General & Remodel2308 EUCLID AVERetroactively permit addition of a living room to rear of existing noncomplying 2-story single family residence. Roll in scope of work from Final ↗
2026-05-11General & Remodel2308 EUCLID AVENew 2-story 4 bedroom 2 bathroom accessory structure consisting of two bedrooms and one bathroom on the first floor with a covered porch andFinal ↗
2026-02-12Electrical1307 E BRAKER LN BLDG 2ePlan: Commercial Expedited Review - [APPROVED] New Construction of 3-Story Worship Learning Center to Include Outdoor Playground [ 10472 SFActive ↗
2025-12-19General & Remodel1307 E BRAKER LN BLDG 2ePlan: Commercial Expedited Review - [APPROVED] New Construction of 3-Story Worship Learning Center to Include Outdoor Playground [ 10472 SFActive ↗
2025-09-23General & Remodel6001 HYLAWN DR BLDG 1Ground up construction of religious assembly hall with outdoor patio areas (836sqft) 4979 total sqftActive ↗
2025-09-23General & Remodel6001 HYLAWN DR BLDG DPDumpster enclosure for ground up construction of religious assemblyActive ↗