Austin › contractor

G & M Plumbing

63 permits on record in Austin (2025-09-08 → 2026-10-22)

Rank in Austin

Plumbing#59 of 267 (30 days, 3 permits)#44 of 959 (12 months, 58)

Permits per month, last 12 months

10
11
12
01
02
03
04
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-22Plumbing2209 LA CASA DRReplace sewer yard line and section of sewer line under home by creating an approx 10ft tunnel.Active ↗
2026-10-14Plumbing7705 TISDALE DRTunnel under home approximately 30ft and replace cast iron drain with schedule 40 PVC up to bottom of foundation and out to exterior cleanouActive ↗
2026-10-07Plumbing3106 ADELPHI LNInstall new RPZ and cap water line.Active ↗
2026-09-23Plumbing6106 BULLARD DRCreate entry tunnel(s) of approx 45ft to replace cast iron drain system with new schedule 40 PVC system up to bottom of foundation.Final ↗
2026-09-03Plumbing2908 PERRY LNTunnel to replumb for 1 bathroom and laundry drain line. Approx 10ft. of tunnel. Trench from cleanout to city tap and replace sewer yard linFinal ↗
2026-08-27Plumbing2303 REMUDA TRLCreate entry tunnel(s) approx 60ft in length to replumb cast iron drain system with schedule 40 PVC (2 baths laundry and kitchen drain) up tFinal ↗
2026-08-14Plumbing5500 FERNVIEW RD BLDG AReplacement of an existing water heaterActive ↗
2026-08-03Plumbing11906 INDIANHEAD DRCreate entry tunnel(s) to replace all cast iron drain system up to bottom of foundation and out to exterior cleanout. Approx 50ft of tunnelFinal ↗
2026-08-03Plumbing7402 VINTAGE HILLS DRTrench sewer yard line to replace with PVC from cleanout to city tap location. Tunnel approx 7ft to repair bathroom drain line.Final ↗
2026-07-27Plumbing3916 EDGEROCK DRReplumb under pier and beam home up to exterior cleanout.Final ↗
2026-07-27Plumbing1508 BROADMOOR DRTunnel to replumb 2 full baths kitchen and laundry drain line up to exterior cleanout. Approx 25ft of tunnelFinal ↗
2026-07-27Plumbing2609 BERKETT DRExpress: Foundation repair Create entry tunnel to replumb 2 full bathrooms and reconnect kitchen and laundry sink App 20ft tunnel.Final ↗
2026-07-16Plumbing4807 WOODVIEW AVETunnel under home in order to replace cast iron with schedule 40 PVC up to bottom of foundation. Approx 30ftFinal ↗
2026-07-15Plumbing5000 COFFEE CUP CVTrench section of sewer yard line and replace up to city tapFinal ↗
2026-07-09Plumbing1700 RAVEY STCreate trench from cleanout up to city tap to replace sewer yard line with schedule 40 PVC line.Final ↗
2026-06-16Plumbing2201 CHASEWYCH DR UNIT 1Replacement of an existing water heaterFinal ↗
2026-06-03Plumbing3807 WILLOWBROOK DRPlumb for master bathroom (repairing bathtub drain)* and relocate washer drain line. *No sheetrock to be removedFinal ↗
2026-06-01Plumbing6103 DERBY CVCreate entry tunnel(s) to replumb/re-route kitchen sink drain line. Tunnel length approx 15ft.Final ↗
2026-06-01Plumbing6712 SHOAL CREEK BLVDCreate entry tunnel(s) approx 25ft to replumb cast iron drain lines up to bottom of foundation and out to exterior cleanout.Final ↗
2026-06-01Plumbing4701 LASSO PATHTunnel approx 30ft under home to re-route kitchen sink drain line to front of house and connect.Final ↗
2026-06-01Plumbing5707 JOE SAYERS AVETrench and replace sewer yard line from cleanout to city tap location.Final ↗
2026-05-28Plumbing2520 BAXTER DRTrench existing sewer yard line up to city tap and replace with schedule 40 PVC.Final ↗
2026-05-28Plumbing7210 FRED MORSE DRCreate entry tunnel(s) under foundation to replumb drain system to bottom of foundation and out to exterior cleanout. Approx tunnel length 4Final ↗
2026-05-28Plumbing7203 FRED MORSE DRTrench and replace sewer yard line with new schedule 40 PVC.Final ↗
2026-05-22Plumbing10106 WOODSTOCK DRReplace cleanout and sewer yard line up to City tap location. Approx 30ftFinal ↗