Austin › contractor

GAF Energy LLC

47 permits on record in Austin (2025-09-30 → 2026-10-22)

Rank in Austin

Electrical#27 of 333 (30 days, 7 permits)#150 of 1218 (12 months, 21)
Solar & Storage#1 of 3 (30 days, 2 permits)#4 of 19 (12 months, 3)

Permits per month, last 12 months

10
12
04
06
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-22Electrical17121 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Active ↗
2026-10-22Electrical17125 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Active ↗
2026-10-22Electrical17205 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Active ↗
2026-10-22Electrical17209 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Active ↗
2026-10-22Electrical17213 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Active ↗
2026-10-19Solar & Storage9416 GAMBOL DRExpress: Installation of a 3.312 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction hActive ↗
2026-10-19Electrical9416 GAMBOL DRExpress: Installation of a 3.312 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction hActive ↗
2026-10-19Solar & Storage9420 GAMBOL DRExpress: Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction hoActive ↗
2026-10-19Electrical9420 GAMBOL DRExpress: Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction hoActive ↗
2026-09-14Electrical17138 RADIANT DRInstallation of a 3.68 kW BIPV solar shingle system. This is part of a new home construction and the utility is Bluebonnet Electric CooperatFinal ↗
2026-06-04Electrical8906 POINTER LNExpress: Installation of GAF Timberline asphalt and energy shinglesActive ↗
2026-06-04Electrical8906 POINTER LNExpress: Installation of GAF Timberline asphalt and energy shinglesFinal ↗
2026-04-01Electrical8700 SPARTA LNInstallation of a 10.58 kW BIPV solar shingle project. Supply side tap. No MPU. Utility is Austin Energy. REVISION 1: Add aux EPFinal ↗
2025-12-19Solar & Storage8700 SPARTA LNInstallation of a 10.58 kW BIPV solar shingle project. Supply side tap. No MPU. Utility is Austin Energy. REVISION 1: Add aux EPFinal ↗
2025-12-19Electrical8700 SPARTA LNInstallation of a 10.58 kW BIPV solar shingle project. Supply side tap. No MPU. Utility is Austin Energy.Final ↗
2025-12-15Electrical17114 RADIANT DRInspections for solar shingles. No express BP or Aux required as this is new constructionFinal ↗
2025-12-15Electrical17118 RADIANT DRInspections for solar shingles. No express BP or Aux required as this is new construction.Final ↗
2025-12-15Electrical17122 RADIANT DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Final ↗
2025-12-15Electrical17130 RADIANT DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Final ↗
2025-12-15Electrical17134 RADIANT DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Final ↗
2025-12-15Electrical9412 GAMBOL DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Final ↗
2025-12-15Electrical9420 GAMBOL DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Pending ↗
2025-12-15Electrical17221 PAMPERING DRInspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.Final ↗
2025-10-28Electrical9404 LILT DR BLDG 2 SOLARExpress: Installation of a 3.68 KW BIPV solar shingle system breaker tie in shingles are nailed to roof This is a new construction home withFinal ↗
2025-10-07Electrical4203 GREYSTONE DRExpress: Installation of a 3.477 KW BIPV solar shingle system supply side tap utility is AE shingles are nailed to the roof and there are noFinal ↗