Austin › contractor

Greenstar Power

40 permits on record in Austin (2025-09-02 → 2026-09-02)

Rank in Austin

Electricalno permits in last 30 days#111 of 1218 (12 months, 28)

Permits per month, last 12 months

11
12
01
05
06
07
08
09

Recent permits

IssuedTradeAddressWorkStatus
2026-09-02Electrical9409 OXBOW STRAP DRSOLAR INSTALLTION WITH A SYSTEM SIZE OF 10.12KW (22) REC460 on IQ8X domesticFinal ↗
2026-09-02Electrical14300 AXEL JOHANSON DRSOLAR PANEL INSTALLTION WITH A SYSTEM SIZE OF 7.36 KW SOLAR SYSTEM.Final ↗
2026-08-28Electrical15917 NARCISSUS WAYINSTALLTION OF A 6.9 SOLAR PANEL SYSTEM WITH 15 PANELS 15 MICRO-INVERTERSFinal ↗
2026-08-28Electrical9517 WIGGY WAYSOLAR PANEL INSTALLTION WITH A SYSTEM SIZE OF 12.42KWFinal ↗
2026-08-26Electrical15936 NARCISSUS WAYINSTALLTION OF A 6.44kW SOLAR SYSTEMFinal ↗
2026-08-25Electrical11604 DOMENICO CVINSTALLTION OF A 6.15 SOLAR PANEL SYSTEAM WITH 15 PANELS 15 MRIO AND 1 BATTERYFinal ↗
2026-08-25Electrical6021 ALFRED ACRES DRINSTALLTION OF A 6.15 SOLAR SYSTEAM WITH 15 PANELS AND 15 MICRO-INVERTESFinal ↗
2026-08-25Electrical5404 MURANO CVINSTALLTION OF A 7.31 SOLAR SYSTEM WITH Q.TRON 430 (DOMESTIC) (x17) Enphase IQ8HC DomesticFinal ↗
2026-08-25Electrical14126 EDNA MAXINE WALKSOLAR INSTALLTION OF A 6.44 SOLAR SYSTEMFinal ↗
2026-08-20Electrical16132 VIBURNUM DRINSTALLTION OF A 7.38kW SOLAR SYSTEM WITH (18) QCell410 on IQ8HC domestic. No MPU or shutdown requiredActive ↗
2026-08-20Electrical1301 RAMBLING ROSE RDINSTALLTION OF A 9.2 SOLAR SYSTEAM WITH 20 PANELS AND 20 MICRO-INVERTERSFinal ↗
2026-08-20Electrical11345 COMANO DRINSTALLATION OF A 9.02 SOLAR SYSTEM WITH Q.PEAK DUO BLK ML-G10.C+ 410W (x22) Enphase IQ8HC Domestic AND ONE ENPHASE BATTERYFinal ↗
2026-08-11Electrical11345 COMANO DRTEMPORAY DISCONNECT/RECONNECT FOR A 10C ENPHASE BATTERYFinal ↗
2026-08-10Electrical11604 DOMENICO CVTEMPORARY DISCONNECT/RECONNECT FOR ENPHASE BATTRYFinal ↗
2026-08-04Electrical11604 MURANO DRSOLAR PANEL SYSTEM WITH A SYSTEM SIZE OF 6.56 Q.PEAK DUO BLK ML-G10.C+ 410W (x16) AND Enphase microinverters (x16)Final ↗
2026-07-31Electrical14021 MATTEROD DRSOLAR INSTALLTION WITH A SYSTEAM SIZE OF 7.38kW SYSTEAM WITH (18) QCell410 on IQ8HC (1) 10C batteryFinal ↗
2026-07-30Electrical14125 AXEL JOHANSON DRINSTALLATION OF A SOLAR SYSTEM SYSTEAM SIZE 6.15KW WITH (15) QCell410 on IQ8HC domestic. No MPU or shutdown requiredFinal ↗
2026-07-30Electrical9200 CORVALLIS DRINSTALLTION OF A 7.38kW SOLAR SYSTEM WITH (18) QCell410 on (18) IQ8HC MICROINVERTERSFinal ↗
2026-07-29Electrical11604 MURANO DRTEMPORARY DISCONNECT/RECONNECTION REQUEST FOR ENPHASE BATTERYFinal ↗
2026-07-17Electrical14021 MATTEROD DRTEMPORARY DISCONNECT/RECONNECTION REQUEST FOR ENPHASE BATTERYFinal ↗
2026-06-29Electrical6008 LADY MILDRED WAYInstallation of roof mounted solar system 6.2kWFinal ↗
2026-05-06Electrical13102 GEARY DRInstallation of a 8.2 solar panels system with Panel Q. PEAK DUO BLK ML-G10.C+ 410W (x20) (20) Enphase IQ8HC DomesticFinal ↗
2026-01-14Electrical903 SALEM LNTEMPOPARY DISCONNECT/RECONNECT REQUESTED FOR Solar and battery installFinal ↗
2025-12-31Electrical5529 CYCLAMEN DRSOLAR INSTALLTION OF A 11.440kW SOLAR SYSTEM WITH 26 ROOF MOUNTED SOLAR PANELS AND 26 MICROINVETERSExpired ↗
2025-12-16Electrical4328 FAR WEST BLVDINSTALLTION OF A 6.880 SOLAR PANEL SYSTEM WITH 16 ROOF MOUNTED SOLAR PANELS AND 1 SOLAREDGEFinal ↗