Austin › contractor

Lighthouse Solar Austin

21 permits on record in Austin (2025-09-22 → 2026-09-16)

Rank in Austin

Solar & Storageno permits in last 30 days#1 of 19 (12 months, 18)
Electricalno permits in last 30 days

Permits per month, last 12 months

10
12
04
05
06
07
08
09

Recent permits

IssuedTradeAddressWorkStatus
2026-09-16Solar & Storage2708 SCENIC DRExpress: rooftop solar electric panels tilted upActive ↗
2026-08-12Solar & Storage1309 CHICON STRooftop Solar Line-Side Tap Interconnection for Existing Multi-Family Building Requires Electrical Permit and Auxiliary Electrical Permit.Active ↗
2026-07-08Solar & Storage8134 MESA DR UNIT BRooftop Solar Line side tap interconnection - Building BFinal ↗
2026-06-29Solar & Storage2105 PARKER LN UNIT HP3QT PV - Rooftop Solar for Building HP3Active ↗
2026-06-29Solar & Storage2105 PARKER LN UNIT LEASEQT PV - Rooftop Solar. Line side tap interconnection for Existing Multi-Family Building Lease Requesting Auxiliary Power EP and Electrical PActive ↗
2026-06-29Solar & Storage2105 PARKER LN UNIT HP2QT PV - Rooftop Solar. Line side tap interconnection for Existing Multi-Family Building-HP3 Requesting Auxiliary Power EP and Electrical PerActive ↗
2026-06-09Solar & Storage13649 RUTLEDGE SPUR BLDG LEASESMART Housing. Rooftop solar. Line side tap interconnection. 2025 124818 DA.Active ↗
2026-06-09Solar & Storage13649 RUTLEDGE SPUR BLDG 3QT PV - Rooftop Solar. Line side tap interconnection AT EXISTING MULTIFAMILY - OVA SMART HousingActive ↗
2026-06-09Solar & Storage13649 RUTLEDGE SPUR BLDG 4QT PV - Rooftop Solar. Backfed breaker interconnection AT EXISTING MULTIFAMILY - OVA SMART HousingActive ↗
2026-05-26Solar & Storage13649 RUTLEDGE SPUR BLDG 1Rooftop Solar Line Side Tap InterconnectionActive ↗
2026-05-26Solar & Storage13649 RUTLEDGE SPUR BLDG 2SMART housing. Rooftop Solar. Line side tap interconnection.Active ↗
2026-05-22Solar & Storage1141 CHICON ST BLDG 1 UNIT HP3SMART HOUSING Rooftop Solar. No battery or energy storage. Line side tap interconnection. Aux EP Needed. Remodel EP not needed.Final ↗
2026-04-28Solar & Storage1141 CHICON ST BLDG 1Rooftop Solar. No battery or energy storage. Two line side tap interconnection. Two Aux EP and Remodel EPs needed.Final ↗
2026-04-27Solar & Storage1141 CHICON ST BLDG 2QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family Final ↗
2026-04-21Solar & Storage1141 CHICON ST BLDG 3Rooftop solar. No battery energy storage. Lineside tap interconnection. Aux EP needed. Remodel EP not needed. Multifamily Affordable HousingFinal ↗
2026-04-07Solar & Storage3005 WESTLAKE DRExpress- Rooftop solar panels tilted up (not aligned with roof plane). Aux Power permit 2024-126200 EP (No PV at the request of the applicanFinal ↗
2025-12-15Solar & Storage4112 MEDICAL PKWYRooftop Solar with Line Side Tap Interconnection.Final ↗
2025-10-28Solar & Storage3823 AIRPORT BLVDRooftop Solar Ballasted with Line Side TapFinal ↗
2025-10-09Electrical3709 JETSON WAYRoof mounted solar electricFinal ↗
2025-09-22Solar & Storage7101 N IH 35 SVRD NBRooftop SolarActive ↗
2025-09-22Solar & Storage11704 N LAMAR BLVDRooftop Solar for existing Multi-family housing.Final ↗