Austin › contractor
M3 Plumbing Services
27 permits on record in Austin (2025-10-22 → 2026-10-19)
Rank in Austin
| Plumbing | #26 of 267 (30 days, 7 permits) | #93 of 959 (12 months, 26) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-19 | Plumbing | 7207 MESA DR | Scope of work includes approximately 100-120 linear feet of tunneling beneath the home and a 60-linear-foot yard line. | Active ↗ |
| 2026-10-01 | Plumbing | 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 200 | SMALL PROJECT - interior remodel. replace all missing fireproofing and fire stopping. affected by new construction with fireproofing to matc | Active ↗ |
| 2026-10-01 | Plumbing | 11044 RESEARCH BLVD SVRD SB BLDG D UNIT 200 | INTERIOR REMODEL -REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MATCH BASE BUILDING E | Active ↗ |
| 2026-10-01 | Plumbing | 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 220 | INTERIOR REMODEL -REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MATCH BASE BUILDING E | Active ↗ |
| 2026-10-01 | Plumbing | 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 210 | INTERIOR REMODEL -REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MATCH BASE BUILDING E | Active ↗ |
| 2026-10-01 | Plumbing | 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 100 | INTERIOR REMODEL -AMENITIES CENTER. REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MAT | Active ↗ |
| 2026-09-29 | Plumbing | 1300 E 5TH ST UNIT 115 | First-generation construction consisting of new demising walls and a pedestrian bridge for a new suite entry. Three suites are shell space/n | Final ↗ |
| 2026-09-03 | Plumbing | 3107 OAK CREEK DR UNIT 200 | Interior alteration of approx. 2050 SF of existing interior space. | Active ↗ |
| 2026-08-30 | Plumbing | 2209 S 1ST ST UNIT 108 | Finish out of existing tenant space 108. Change of use approved. No access control. Suite 108 and suite 101B will be occupied by the same bu | Active ↗ |
| 2026-08-24 | Plumbing | 2209 S 1ST ST UNIT 101 | Finish out to existing mixed use bldg-suite 101 is an existing shell. Proposed bookstore with accessory coffee shop GIIVR requested. NO acce | Final ↗ |
| 2026-07-29 | Plumbing | 901 S MOPAC EXPY SVRD NB BLDG 2 UNIT 130 | Interior remodel to existing business office suite. No access control. No change of use. | Final ↗ |
| 2026-07-22 | Plumbing | 5000 PLAZA ON THE LAKE | Interior alteration of an existing office space including a new demising wall to create separate suites 260 & 265 - (2) applications Suite 2 | Final ↗ |
| 2026-07-15 | Plumbing | 2511 W PARMER LN | Hand tunnel beneath the existing commercial building to access the sanitary sewer system. Remove and replace approximately 4050 linear feet | Active ↗ |
| 2026-07-05 | Plumbing | 4301 BULL CREEK RD UNIT 140 | 7 DAY - FINISH OUT OF ADMIN OFFICE - OVA | Final ↗ |
| 2026-06-17 | Plumbing | 12345 N LAMAR BLVD UNIT 210 | Interior remodel to existing office space with new demising partition to reconfigure suites. Suite 230 is not in scope and will be permitted | Final ↗ |
| 2026-06-09 | Plumbing | 5000 PLAZA ON THE LAKE UNIT 265 | Interior alteration of an existing office space including a new demising wall to create separate suites 260 & 265 - (2) applications Suite 2 | Final ↗ |
| 2026-05-20 | Plumbing | 11501 ROCK ROSE AVE UNIT 146 | Interior remodel of existing pizza restaurant to accommodate new pizza restaurant | Final ↗ |
| 2026-05-13 | Plumbing | 8911 N CAPITAL OF TEXAS HWY NB BLDG 3 UNIT 3220 | Interior remodel to business office suite. Minor MEP work with new demising and partition walls and finish work. No access control. | Final ↗ |
| 2026-04-21 | Plumbing | 8911 N CAPITAL OF TEXAS HWY NB BLDG 3 UNIT 3200 | Interior remodel to business office suite. Minor MEP work with new demising and partition walls and finish work. No access control. | Final ↗ |
| 2026-04-19 | Plumbing | 13450 N US 183 HWY SVRD SB UNIT 234 | Interior remodel to existing suite with change of use from personal services to tutoring center both B uses. MEP Scope and structural verifi | Final ↗ |
| 2026-04-08 | Plumbing | 1600 W 38TH ST UNIT 407 | Expansion of #407 to #408 medical office for sleep apnea | Final ↗ |
| 2026-03-07 | Plumbing | 1600 W 38TH ST UNIT 318 | Interior Finish-out for Medical Office | Final ↗ |
| 2026-02-04 | Plumbing | 6300 LA CALMA DR UNIT 215 | 7 DAY MINOR DEMOLITION CONSTRUCCTION OF NEW DEMISING WALLS ALTERATION OF EXISTING CABINETRY IN WORK ROOM NEW CABINETRY AND PLUMBING FOR BREA | Final ↗ |
| 2026-01-08 | Plumbing | 1717 W 6TH ST UNIT 350 | Interior remodel to business office. No access control. No change of use. No plumbing scope. Business use no medical office use. | Final ↗ |
| 2026-01-07 | Plumbing | 12345 N LAMAR BLVD BLDG 1 UNIT 135 | Interior remodel to existing business office to demise 135 as a new suite. No plumbing scope. Minor Mech and Electrical work in this suite. | Final ↗ |