Austin › contractor

Mechanical Technical Services LP

44 permits on record in Austin (2025-09-17 → 2026-10-08)

Rank in Austin

HVAC & Mechanical#37 of 194 (30 days, 4 permits)#83 of 825 (12 months, 20)
Electrical#166 of 333 (30 days, 1 permits)#284 of 1218 (12 months, 10)
General & Remodelno permits in last 30 days#378 of 2443 (12 months, 4)

Permits per month, last 12 months

12
01
02
04
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-08HVAC & Mechanical3600 PRESIDENTIAL BLVD BLDG 7035ePlan: BAUS Review - Interior Remodel on Apron Level for Southwest Airlines (3900 SF).Active ↗
2026-10-05Electrical311 BOWIE STEmergency-Temporary Electrical wiring to reenergize occupied spaces until permanent repairs can be made as per Hyatt Dunn.Active ↗
2026-09-29HVAC & Mechanical5707 SOUTHWEST PKWY BLDG 2ePlan: Commercial Expedited Review - Interior Remodel to Existing Business Lab (148132 SF).Final ↗
2026-09-29HVAC & Mechanical1201 W 38TH STInterior remodel existing hospital areas. Xray 5Active ↗
2026-09-29HVAC & Mechanical1201 W 38TH STInterior remodel existing hospital areas. CT-2 (1st Floor)Active ↗
2026-09-18HVAC & Mechanical919 E 32ND STRemodel Hospital - 2nd Floor - Surgery - with associated above and below ceiling/floor work. (2) ApplicationsActive ↗
2026-09-18HVAC & Mechanical919 E 32ND STRemodel Hospital - 2nd Floor - PACU - with associated above and below ceiling/floor work (2) ApplicationsActive ↗
2026-09-18HVAC & Mechanical5707 SOUTHWEST PKWY BLDG 1ePlan: Commercial Expedited Review - Interior Remodel to Existing Accessory Use Cafe Space within Office Building. Including non structural Active ↗
2026-09-08Electrical601 E ST JOHNS AVE BLDG JRepair or replace damaged or stolen parts of the main electrical serviceFinal ↗
2026-09-08HVAC & Mechanical11206 JOSEPH CLAYTON DRInterior remodel admin areas at existing telecom facility - lighting and HVAC only.Active ↗
2026-09-02HVAC & Mechanical5707 SOUTHWEST PKWY BLDG GARePlan: Commercial Expedited Review Interior Remodel to Parking Garage for New Mechanical Room to be used for Chilling Units to Serve BuildinFinal ↗
2026-09-02HVAC & Mechanical9825 SPECTRUM DR BLDG 4 UNIT 400Interior remodel existing admin areas. Scope does not overlap with 2024-063139 BPActive ↗
2026-09-02Electrical601 E ST JOHNS AVE BLDG IEmergency Electrical Repairs to electrical service at AISD school due to vandalism and theftFinal ↗
2026-08-17General & Remodel1100 E HOWARD LN BLDG 2 UNIT 200New RTUActive ↗
2026-08-11Electrical2121 W PARMER LN UNIT 109EMERGENCY REPAIR-Replace damaged 200-amp meter base and disconnect FOR UNIT 109Active ↗
2026-08-03HVAC & Mechanical12221 N MOPAC EXPY SVRD NBePlan: Commercial Expedited Review - Interior Remodel to Existing Emergency Department at Hospital - Phase 2 (1007145 SF)Active ↗
2026-07-30HVAC & Mechanical5245 W US 290 HWY SVRD EBThis project will add a new Cath Lab to existing Surgical Suite on the second floor of the facility. This Cath Lab will require the relocatiActive ↗
2026-07-23HVAC & Mechanical9900 SPECTRUM DR46000 SF of Level I and II interior renovations (IEBC) to an existing building for Round Rock ISD & minor site improvements.Active ↗
2026-06-15HVAC & Mechanical701 E PARMER LN BLDG PS2MEP systems upgrade and expansion along with addition of server rack and associated equipment in an existing building. **Rev #1: LAB MEP EquActive ↗
2026-05-14Electrical1130 RUTHERFORD LN BLDG 2 UNIT 26015-25 Day INSTALL new (2) Make-up Air units and some exhaust duct work for customers existing equipmentFinal ↗
2026-05-11Electrical1201 PAYTON GIN RD BLDG EReplace electrical service pole that fell over.Final ↗
2026-05-04Pools & Spas7300 HART LNINSTALL NEW EXHUAST DUCT FAN LOUVER TO POOL PUMP HOUSEActive ↗
2026-05-04HVAC & Mechanical7300 HART LNINSTALL NEW EXHUAST DUCT FAN LOUVER TO POOL PUMP HOUSEActive ↗
2026-04-28HVAC & Mechanical1130 RUTHERFORD LN BLDG 2 UNIT 26015-25 Day INSTALL new (2) Make-up Air units and some exhaust duct work for customers existing equipmentFinal ↗
2026-04-23General & Remodel1130 RUTHERFORD LN BLDG 2 UNIT 26015-25 Day INSTALL new (2) Make-up Air units and some exhaust duct work for customers existing equipmentActive ↗