Austin › contractor

Oxford Plumbing Services LLC

14 permits on record in Austin (2025-09-11 → 2026-10-19)

Rank in Austin

Plumbing#143 of 267 (30 days, 1 permits)#199 of 959 (12 months, 11)
Roofing#4 of 20 (30 days, 2 permits)#26 of 171 (12 months, 2)

Permits per month, last 12 months

10
11
01
02
03
06
07
08
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-19Plumbing3011 E MARTIN LUTHER KING JR BLVD BLDG 2Express: Demo and remodel the shower stall area; convert from shower to tub. Redo floor tile. Reuse baseboard trim toilet and vanity. IncludActive ↗
2026-10-14Roofing3011 E MARTIN LUTHER KING JR BLVD BLDG 2Express: Demo and remodel the shower stall area; convert from shower to tub. Redo floor tile. Reuse baseboard trim toilet and vanity. IncludActive ↗
2026-10-06Roofing3011 E MARTIN LUTHER KING JR BLVD BLDG 2EXPRESS: Demo and remodel the shower stall area convert from shower to tub. Redo floor tile. Re use base port trim toilet vanity Includes waActive ↗
2026-08-24Plumbing2119 WYCHWOOD DRReplace yard line/ water line (potable) New homeowner shut off + PRVFinal ↗
2026-08-17Plumbing1818 W 35TH STePlan: Commercial Expedited Review - Addition to Existing Office Building. Work to include 1000 SF New Shell Building and New Wood Deck and Active ↗
2026-07-28Plumbing2420 WILSON STReplace the existing sewer service line from the main to the building including trenching a short tunnel at the building entrance and replacFinal ↗
2026-06-29Plumbing10808 STRAND STTunnel and repair building drainFinal ↗
2026-03-10Plumbing1104 BROOKSWOOD AVEReplace 55 feet mainline sewerFinal ↗
2026-02-18Plumbing812 PARK BLVDTotal Demo of SFR 2110 sq ft circa 1937 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notifiFinal ↗
2026-01-29Plumbing3308 TEXAS STAR LNReplacement of an existing water heater Replacement of existing Noritz tanklessFinal ↗
2026-01-02Plumbing6608 ASHLAND DRReplacement of an existing water heater Converting storage water heater to tankless Waterheater.Expired ↗
2025-11-10Plumbing11915 RENNALEE LOOPReplace all building drain under home by tunneling up to 60 linear feet.Final ↗
2025-10-27Plumbing6105 ARBOR CREST LNReplacing front yard sewer line 20 feet starting at city sewer tap.Expired ↗
2025-09-11Plumbing5716 HIGHLAND HILLS DRAddition/Remodel - Primary bedroom bathroom closet addition. Remodel of existing bedroom into bedroom and hallwayFinal ↗