Austin › contractor

Prism Electric Inc

60 permits on record in Austin (2025-09-09 → 2026-10-06)

Rank in Austin

Electrical#166 of 333 (30 days, 1 permits)#46 of 1218 (12 months, 52)
General & Remodel#129 of 400 (30 days, 1 permits)#1044 of 2443 (12 months, 1)

Permits per month, last 12 months

01
02
03
04
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-06General & Remodel6101 HIGHLAND CAMPUS DR BLDG 2000Installation of Building UPS System for Building 2000Active ↗
2026-10-01Electrical711 W 38TH ST BLDG C UNIT 1We are fixing an AE meter enclosure on a 175amp 120/208v 3phase service. We have to have it permitted because the AE is going to have to shuActive ↗
2026-09-25Electrical1201 W 38TH STInterior remodel existing hospital areas. Xray 5Active ↗
2026-09-25Electrical1201 W 38TH STInterior remodel existing hospital areas. CT-2 (1st Floor)Active ↗
2026-08-27Electrical3600 PRESIDENTIAL BLVDePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)Active ↗
2026-08-27Electrical11521 N FM 620 RD BLDG AAddition of two (2) natural gas backup generators on a leveling pad on existing concrete.Active ↗
2026-08-10Electrical2535 RIDGEPOINT DRePlan: Commercial Expedited Review - Interior Remodel to Existing Energy X Office Building (2575 SF)Active ↗
2026-08-06Electrical9900 SPECTRUM DR46000 SF of Level I and II interior renovations (IEBC) to an existing building for Round Rock ISD & minor site improvements.Active ↗
2026-08-04Electrical12221 N MOPAC EXPY SVRD NBePlan: Commercial Expedited Review - Interior Remodel to Existing Emergency Department at Hospital - Phase 2 (1007145 SF)Active ↗
2026-07-31Electrical11800 DOMAIN BLVDInterior remodel of existing space. Demo and install new partition walls new finished and lighting fixtures. Existing business offices.Final ↗
2026-07-15Electrical2222 ROSEWOOD AVEInstall new CT can that needs Austin Energys designFinal ↗
2026-06-16Electrical3600 PRESIDENTIAL BLVDConstruction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual RamActive ↗
2026-06-16Electrical3600 PRESIDENTIAL BLVD(3600 Presidential Blvd) Interior renovations within an existing building for virtual ramp control system improvements; includes finishing oFinal ↗
2026-05-19Electrical1301 W 38TH ST UNIT 102Interior remodel of medical office tenant space in existing 7-story office buildingFinal ↗
2026-05-01Electrical12221 N MOPAC EXPY SVRD NBRemodel existing 1st floor hospital areas.Final ↗
2026-04-06Electrical500 E CESAR CHAVEZ STePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Existing Convention Center - Underground Work Only. (Excludes 1 StActive ↗
2026-03-19Electrical7000 BURLESON RD BLDG B UNIT 100ePlan: Commercial Expedited Review - Finish out to Expand Data Center into existing Shell Areas. Scope of Work Includes 2 AE Transformers. (Active ↗
2026-03-18Electrical12401 RESEARCH BLVD SVRD NB BLDG GARRemodel existing parking garage and add site security features. Scope includes cameras new entry gates security grills over existing windowsExpired ↗
2026-03-18Electrical111 CONGRESS AVEGrounding for the entire buildingFinal ↗
2026-03-17Electrical11800 ALTERRA PKWY UNIT FLR16ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase16-B.Final ↗
2026-02-24Electrical11800 ALTERRA PKWY UNIT FLR1VOID No inspection performed or needed. ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase1-E Temp VOID ↗
2026-02-17Electrical11800 ALTERRA PKWY UNIT FLR13ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase13-C.Final ↗
2026-02-06Electrical11800 ALTERRA PKWY UNIT FLR1ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas on Floor 1. Phase1-C.Final ↗
2026-02-06Electrical11800 ALTERRA PKWY UNIT FLR9ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase9-A.Final ↗
2026-02-06Electrical11800 ALTERRA PKWY UNIT FLR9ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase9-B.Final ↗