60 permits on record in Chicago (2025-09-11 → 2026-10-15) · declared value $92,427,664

Rank in Chicago

Electrical#12 of 227 (30 days, 5 permits)#13 of 769 (12 months, 53)

Permits per month, last 12 months

11
12
01
02
03
04
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-15Electrical800 W FULTON MARKETELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO 8TH FLOOR OFFICE SPACE. WORK TO INCLUDE DEMO, NEW PARTITIONS, MECHANICAL & ELECTRICAL. STRUCTURA ↗
2026-10-06Electrical5230 N LINCOLN AVESPR 2019 CBRC: SOLAR PERMIT. INSTALLATION OF A NEW 34 KW PHOTOVOLTAIC SYSTEM WITH 40.96 KWH ESS SYSTEM ON THE ROOF OF AN EXISTING 2-STORY MI ↗
2026-10-06Electrical71 S WACKER DRSCSELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING SUITE 4620. WORK TO INCLUDE DEMO, NEW PARTITIONS AND DOORS, MECHANICAL, ELECTRICAL A ↗
2026-09-28Electrical222 W ADAMS STSELF CERT 2019 CBRC: STRUCTURAL PEER REVIEW INCLUDED. INTERIOR ALTERATIONS TO 26TH AND 27TH FLOOR OFFICE SPACE. WORK TO INCLUDE DEMO, NEW PA ↗
2026-09-28Electrical71 S WACKER DRSELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING SUITE 4650. WORK TO INCLUDE NEW NON-STRUCTURAL PARTITIONS, DOORS, MECHANICAL, ELECTRIC ↗
2026-09-24Electrical211 E CHICAGO AVESELF CERT 2019 CBC: INTERIOR BUILDOUT OF A NEW C-SUITE ON THE 22ND FLOOR OF THE EXISTING LURIE CHILDRENS HOSPITAL AT 211 E CHICAGO AVE TO IN ↗
2026-09-22Electrical200 E RANDOLPH STSELF-CERT 2019 CBRC: NONSTRUCTURAL INTERIOR DEMOLITION, INCLUDING REMOVAL OF MEP SYSTEMS ON THE 39TH, 40TH & 41ST FLOORS IN EXISTING 83 -STO ↗
2026-09-21Electrical200 E RANDOLPH STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING SINGLE OFFICE TENANT WITHIN EXISTING HIGH-RISE OFFICE BUILDING ON THE 40TH, 41ST AND 4 ↗
2026-09-21Electrical71 S WACKER DRSELF CERT 2019 CBRC: INTERIOR ALTERATION OF EXISTING 10TH FLOOR BUILDOUT INCLUDING DEMOLITION AND THE DEMISE OF NEW SUITE 1050 FOR FUTURE BU ↗
2026-08-20Electrical932 N RUSH STSELF CERT 2019 CBRC: PHASE 2 OF 2: INTERIOR ALTERATION TO AN EXISTING GROUND FLOOR RETAIL STORE. WORK INCLUDES, NEW PARTITIONS, LIGHTING, EL ↗
2026-08-19Electrical8700 W BRYN MAWR AVESELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 10TH FLOOR OFFICE SPACE - SUITE 1050N. SCOPE TO INCLUDE DEMOLITION; NEW INTERIOR LAYOU ↗
2026-08-18Electrical8700 W BRYN MAWR AVESELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 10TH FLOOR OFFICE SPACE - SUITE 1000S. SCOPE TO INCLUDE DEMOLITION AND NEW TENANT DEMI ↗
2026-08-18Electrical8700 W BRYN MAWR AVESELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 10TH FLOOR OFFICE SPACE - SUITE 1010S. SCOPE TO INCLUDE DEMOLITION AND NEW TENANT DEMI ↗
2026-08-17Electrical8600 W BRYN MAWR AVESELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 6TH FLOOR OFFICE SPACE - SUITE 650N. SCOPE TO INCLUDE DEMOLITION; NEW INTERIOR LAYOUT, ↗
2026-08-17Electrical8600 W BRYN MAWR AVESELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 9TH FLOOR OFFICE SPACE - SUITE 900N. SCOPE TO INCLUDE DEMOLITION AND NEW TENANT DEMISE ↗
2026-08-10Electrical932 N RUSH STSELF CERT 2019 CBRC: PHASE 1 DEMO ONLY. INTERIOR DEMOLITION OF NON-LOADING BEARING PARTITIONS, CEILING FINISHES, LIGHTING FIXTURES, AND MECH ↗
2026-08-06Electrical151 N FRANKLIN STSELF CERT 2019 CBRC: COMMERCIAL TENANT IMPROVEMENT ON 8TH FLOOR INCLUDING INSTALLATION OF NEW ACOUSTIC OFFICE POD AND ASSOCIATED ELECTRICAL ↗
2026-07-24Electrical959 W FULLERTON AVEDDS 2019 CBC: ALTERNATION ON LEVELS 01 AND 02 OF EXISTING UNIVERSITY BUILDING TO CREATE THE UNIVERSITY WELCOME CENTER WITH LOBBY, GALLERY, M ↗
2026-07-24Electrical116 S MICHIGAN AVESELF-CERTIFICATION 2019 CBRC: INTERIOR ALTERATION OF 28,019 SQUARE FEET OF EXISTING OFFICE SPACE IN AN EXISTING HIGH RISE OFFICE BUILDING. T ↗
2026-07-20Electrical180 N STETSON AVESELF-CERT 2019 CBRC: ALTERATION OF INTERIOR OFFICE SUITE ON FLOOR 9 IN AN EXISTING 58 STORY BUILDING. NO CHANGE IN OCCUPANCY OR CONSTRUCTION ↗
2026-07-07Electrical222 N LA SALLE STSELF-CERT 2019 CBC: INTERIOR ALTERATIONS TO 11TH FLOOR. SCOPE CONSISTS OF 4 SPEC SUITES (1100, 1125, 1135, & 1150), FULL RESTROOM RENOVATION ↗
2026-06-25Electrical111 S WACKER DRSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS WITHIN EXISTING OFFICE BUILDING ON THE 33RD FLOOR TO COMBIND OFFICE SUITES 3340 AND 3345 INTO A SI ↗
2026-06-01Electrical112 S MICHIGAN AVESELF-CERTIFICATION 2019 CBRC: INTERIOR ALTERATION OF EXISTING OFFICE SPACE IN AN EXISTING HIGH RISE OFFICE BUILDING. THE SCOPE OF WORK INCLU ↗
2026-05-29Electrical222 N LA SALLE STSELF CERT 2019 CBRC INTERIOR ALTERATIONS TO SUITE 1500 FOR MICHAEL BAKER.. WORK INCLUDES MEW PARTITIONS, FINISHES, MILLWORK, MECHANICAL, ELE ↗
2026-05-21Electrical37 S WABASH AVESELF-CERTIFICATION 2019 CBRC: INTERIOR ALTERATION OF EXISTING OFFICE SPACE IN AN EXISTING HIGH RISE OFFICE BUILDING. THE SCOPE OF WORK INCLU ↗