Chicago › contractor

PEPPER CONSTRUCTION COMPANY

10 permits on record in Chicago (2025-12-18 → 2026-10-20) · declared value $217,394,103

Rank in Chicago

General & Remodel#19 of 122 (30 days, 1 permits)#18 of 935 (12 months, 10)

Permits per month, last 12 months

12
03
04
05
06
08
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-20General & Remodel1331 S WELLS STDDS 2019 CBC: ENCLOSURE ONLY PERMIT FOR A 4-STORY STADIUM WITH NO BASEMENT ON PILES. NO MEP WORK. PILES ONLY PERMIT UNDER 101075594, SHALLOW ↗
2026-08-04General & Remodel1331 S WELLS STDDS 2019 CBC: REVISION TO 101075594. REVISIONS INCLUDE ADDITIONAL PILES, PILE TYPE CHANGES, AND LOWERING OF PILE CAPS FOR THE NEW CONSTRUCTI ↗
2026-06-05General & Remodel1331 S WELLS STEAST TOWER CRANE PERMIT APPLICATION FOR THE INSTALLATION AND OPERATION OF A LIEBHERR 316 EC-H12 LITRONIC CRANE, AS PER PLANS. ↗
2026-06-03General & Remodel1331 S WELLS STDDS 2019 CBC: SUPERSTRUCTURE ONLY PERMIT FOR A PROPOSED 4-STORY STADIUM WITH NO BASEMENT ON PILES. PILES ONLY PERMIT UNDER 101075594, SHALLO ↗
2026-05-21General & Remodel1331 S WELLS STWEST TOWER CRANE PERMIT FOR THE INSTALLATION AND OPERATION OF A PEINER SK-415 FREESTANDING CRANE, AS PER PLANS. ↗
2026-05-14General & Remodel1200 S LAKE SHORE DRDDS 2019 CBRC & CBC: REVISION TO PERMIT #100994422 FOR LANDSCAPE UPDATES ONLY. NORTH SIDE OF EXISTING STAIRCASE, PROPOSED PLANNING REMOVED A ↗
2026-04-24General & Remodel1331 S WELLS STDDS 2019 CBC: SHALLOW FOUNDATIONS ONLY FOR THE NEW CONSTRUCTION OF A 4 STORY STADIUM (OCC GROUPS A-5, B, S, M; CONST TYPE IA)CONSULTANT REVI ↗
2026-04-09General & Remodel33 E IDA B WELLS DRSELF-CERT: REVISION TO PERMIT 101078579 TO INCLUDE EXTERIOR STOREFRONT REVISIONS ONLY. ORIGINAL PERMIT INCLUDED THE STOREFRONT REPLACEMENT I ↗
2026-03-20General & Remodel1331 S WELLS STDDS 2019 CBC: PILES ONLY PERMIT (VERTICAL PENETRATION ONLY) FOR THE NEW CONSTRUCTION OF A 4 STORY STADIUM (OCC GROUPS A-2, A-3, A-5, B, S-1, ↗
2025-12-18General & Remodel1060 W ADDISON STDDS 2019 CBC TO REPLACE A RAMP FROM THE TERRACE TO UPPER DECK. (OCCUPANCY GROUPS: A-5; TYPE 2 CONSTRUCTION. ALL AS PER PLANS CONSULTANT REVI ↗