Mesa › contractor
Scott Pickering
26 permits on record in Mesa (2026-04-23 → 2026-10-19) · License 350750 · declared value $45,000
Rank in Mesa
| Electrical | #1 of 4 (30 days, 2 permits) | #2 of 42 (12 months, 26) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-19 | Electrical | 2127 W PLATA AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL | C of C Issued ↗ |
| 2026-10-02 | Electrical | 11138 E RISATA AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL EXPANSION PACK. ALL WORK TO BE PERFORMED PER 202 | C of C Issued ↗ |
| 2026-09-15 | Electrical | 2218 W OLLA CIR | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-09-10 | Electrical | 548 W PAMPA AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL | C of C Issued ↗ |
| 2026-09-10 | Electrical | 916 W JEROME CIR | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL | C of C Issued ↗ |
| 2026-09-10 | Electrical | 2446 S PLAYA | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-09-01 | Electrical | 2302 W NOPAL AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-09-01 | Electrical | 2302 W MONTEREY CIR | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-08-28 | Electrical | 2327 E CAMINO ST | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-08-27 | Electrical | 1630 W ALCOTT ST | PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE W | C of C Issued ↗ |
| 2026-08-07 | Electrical | 7121 E BIRCHWOOD AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-08-05 | Electrical | 1401 S REVERE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-07-31 | Electrical | 527 N ROANOKE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-07-31 | Electrical | 2119 S EXTENSION RD | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCT | C of C Issued ↗ |
| 2026-07-23 | Electrical | 6739 E ARBOR AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-07-17 | Electrical | 1920 S HILL | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCT | C of C Issued ↗ |
| 2026-07-16 | Electrical | 3715 E ARBOR CIR | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL | C of C Issued ↗ |
| 2026-07-15 | Electrical | 4644 E CALYPSO AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL | C of C Issued ↗ |
| 2026-07-06 | Electrical | 1846 S 24TH ST | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-06-11 | Electrical | 1028 W MONTE AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-06-11 | Electrical | 1741 W BEDFORD ST | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INS | C of C Issued ↗ |
| 2026-06-11 | Electrical | 7952 E GALE AVE | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INS | C of C Issued ↗ |
| 2026-06-03 | Electrical | 1116 W ENID AVE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | C of C Issued ↗ |
| 2026-05-28 | Electrical | 1013 S REVERE | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTR | Finaled – C of C Required ↗ |
| 2026-04-28 | Electrical | 9531 E FAIRFIELD ST | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTR | C of O Issued ↗ |