New York City › contractor

MARIC MECHANICAL INC

149 permits on record in New York City (2025-09-18 → 2026-10-22) · License 006125 · declared value $75,856,762

Rank in New York City

HVAC & Mechanical#177 of 642 (30 days, 1 permits)#8 of 3536 (12 months, 77)
General & Remodel#384 of 1322 (30 days, 1 permits)#33 of 6342 (12 months, 71)

Permits per month, last 12 months

11
12
02
03
04
05
07
08
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-22General & Remodel343 CLASSON AVENUE BROOKLYNRENOVATION OF CELLAR MECHANICAL ROOM - NYCHA BOILERS. WORK INCLUDES INSTALL NEW LOUVERS-REPLACE DOORS & FRAMES-MISCELLANEOUS SITE WORK, INCLPermit Issued ↗
2026-10-22HVAC & Mechanical343 CLASSON AVENUE BROOKLYNReplacement of HVAC equipment (Vacuum pump, condensate pump)Permit Issued ↗
2026-08-24HVAC & Mechanical25 26 75 STREET QUEENSLEXINGTON SCHOOL FOR THE DEAF: INSTALLATION OF TEMPORARY STACK, STEAM, CONDENSATE, MAKE-UP WATER PIPING CONNECTED TO A MOBILE BOILER TRAILERPermit Issued ↗
2026-07-23HVAC & Mechanical35 02 24 STREET QUEENSReplacement of existing vacuum and condensate pumps. Installation of flues for new domestic and hot water heaters.Signed-off ↗
2026-05-26HVAC & Mechanical160 CONVENT AVENUE MANHATTANTEMPORARY MECHANICAL PIPING FOR TEMPORARY BOILER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCYPermit Issued ↗
2026-05-19HVAC & Mechanical65 70 KISSENA BOULEVARD QUEENSmechanical work for Queens College Central Chiller Plant upgrade asper plans filed herewith. no change in use, egress or occupancySigned-off ↗
2026-05-14HVAC & Mechanical275 CONVENT AVENUE MANHATTANTEMPORARY MECHANICAL PIPING FOR TEMPORARY BOILER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCYPermit Issued ↗
2026-05-08General & Remodel171 05 137 AVENUE QUEENSProvide positive side waterproofing via barrier injection grouting at Fuel tank chamber, House trap pit, and boiler pit. Provide epoxy injecPermit Issued ↗
2026-05-08HVAC & Mechanical171 05 137 AVENUE QUEENSPS 80Q - Replace fuel piping to convert boilers to bio-fuel. Replace steam traps and controls. No change in egress, use or occupancy.Permit Issued ↗
2026-05-08General & Remodel171 05 137 AVENUE QUEENSPS 80Q-Add doors to boiler room and oil tank room, modify above-ground areaway, add louvers and miscellaneous construction in conjunction wiPermit Issued ↗
2026-04-02General & Remodel2271 STILLWELL AVENUE BROOKLYNFILING FOR PAD EXTENSION RELATED TO BOILER REPLACEMENT/REMOVAL PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.Permit Issued ↗
2026-04-02General & Remodel415 LAFAYETTE AVENUE BROOKLYNRENOVATION OF CELLAR MECHANICAL EQUIPMENT ROOM - NYCHA BOILERSPermit Issued ↗
2026-04-02HVAC & Mechanical415 LAFAYETTE AVENUE BROOKLYNReplacement of HVAC equipment (Vacuum pump, condensate pump)Permit Issued ↗
2026-03-31HVAC & Mechanical2328 WEST 8 STREET BROOKLYNFILING FOR PUMPS FOR REPLACEMENT OF DOMESTIC HOT WATER SYSTEM PER PLANS FILED HEREWITH. ALL PL AND GC WORK TO BE FILED UNDER SEPARATE APPLICPermit Issued ↗
2026-03-31General & Remodel2328 WEST 8 STREET BROOKLYNFILING FOR SELECTIVE REMOVALS OF EQUIPMENT IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.Permit Issued ↗
2026-03-26HVAC & Mechanical183 SOUTH THIRD STREET BROOKLYNK050, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND WATER PIPING TO CONNECT TEMPORARY BOILER DURING RENOVATION OF MAIN BUILDING Permit Issued ↗
2026-03-26HVAC & Mechanical100 WEST 84 STREET MANHATTANPS 009M, INSTALLATION OF TEMPORARY BOILER BREECHING / STACK, STEAM, AND CONDENSATE PIPING SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION Permit Issued ↗
2026-03-26HVAC & Mechanical1025 MORRISON AVENUE BRONXJS 123X, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE & MAKEUP WATER PIPING TO CONNECT TEMPORARY BOILER ON BEHALF OF CONTRACTOR IN CPermit Issued ↗
2026-03-23General & Remodel12 22 35 AVENUE QUEENSReplacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gasPermit Issued ↗
2026-03-23HVAC & Mechanical12 22 35 AVENUE QUEENSNYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOTSigned-off ↗
2026-03-20General & Remodel2336 WEST 8 STREET BROOKLYNFILING FOR PAD EXTENSION RELATED TO BOILER REPLACEMENT/REMOVAL PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.Permit Issued ↗
2026-03-20HVAC & Mechanical35 20 24 STREET QUEENSNYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOTSigned-off ↗
2026-03-20General & Remodel35 51 21 STREET QUEENSReplacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired wateSigned-off ↗
2026-03-20General & Remodel12 15 36 AVENUE QUEENSReplacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gasPermit Issued ↗
2026-03-20General & Remodel35 03 12 STREET QUEENSReplacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gasSigned-off ↗