Peoria › contractor
Aneva Solar
6 permits on record in Peoria, 2026-03-02 to 2026-10-06
No open permits past 120 days on record
Pro keeps watching and emails you the moment one gets close.
Rank in Peoria
| Trade | 30 days | 90 days | 12 months |
|---|---|---|---|
| Solar & Storage | #5 of 17 (2) | #16 of 31 (2) | #18 of 65 (6) |
Permits per month, last 12 months
Recent permits (6 of 6)
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-06 | Solar & Storage | 10903 W MARCO POLO RD | INSTALLATION OF 11.44 KW ROOFTOP SOLAR (APS) | Permit Issued ↗ |
| 2026-09-28 | Solar & Storage | 9228 W ROBIN LN | 11kw PV SYSTEM W/PW3-ESS(13.5kW) PCS & TESLA BACKUP METER (APS) (2x breakers W/no history of a permit shall be removed or an approved permit | Final ↗ |
| 2026-07-16 | Solar & Storage | 8634 W GREENBRIAN DR | NEW 200A SOLAR READY PANEL WITH MAX 100A PV (90A INSTALLED) | Final ↗ |
| 2026-07-16 | Solar & Storage | 8634 W GREENBRIAN DR | Installation of a rooftop solar photovoltaic system consisting of 43 SEG 440W BTD BG Black solar modules, for a total system size of 18.92 k | Final ↗ |
| 2026-06-11 | Solar & Storage | 8634 W GREENBRIAN DR | EMAIL - REMOVAL OF OLD SOLAR SYSTEM | Final ↗ |
| 2026-03-02 | Solar & Storage | 32437 N 134TH LN | SOLAR - 19800 kW PV SYS, W/SS TAP(APS) (EVC circuit shall be removed or app permit prior to final) | Final ↗ |