Peoria › contractor

INTY POWER

41 permits on record in Peoria, 2025-12-11 to 2026-10-06

No open permits past 120 days on record

Pro keeps watching and emails you the moment one gets close.

Rank in Peoria

Trade30 days90 days12 months
Solar & Storage#10 of 17 (1)#4 of 31 (11)#3 of 65 (28)
Electrical#4 of 15 (2)#5 of 43 (3)#4 of 111 (10)
Pools & Spasno permitsno permits#40 of 116 (1)

Permits per month, last 12 months

11
12
01
02
03
04
05
06
07
08
09
10
Recent permits (25 of 41)
IssuedTradeAddressWorkStatus
2026-10-06Solar & Storage8714 W BECKER LN11.50 KW PV SYST W/PW3-ESS,13.50kWh & TESLA BACKUP SW. (APS)Permit Issued ↗
2026-10-06Electrical8714 W BECKER LN100A to 200A/225A BUSS MPU Exst Electrode, GEC, water/gas Bonding shall be compliant for 200A SESPermit Issued ↗
2026-10-06Other7814 W PARADISE DRREMOVE EXISTING SES FOR STUCCO WORK AND RE-INSTALL.Permit Issued ↗
2026-09-29Electrical7857 W REDFIELD RDMAIN BREAKER DE-RATE FROM 200A TO 150AFinal ↗
2026-09-22Solar & Storage7857 W REDFIELD RDADD 7.6KW TESLA PW3-ESS & TESLA REMOTE METER TO COMBINER PANEL W/EXST SYST 13.50 kWh (APS)Final ↗
2026-09-21Solar & Storage10049 W ANGELS LNSOLAR APP - INSTALLATION OF A 4.10 KW (AC) PV SYSTEM + 13.50 KW BATTERY STORAGE (APS)Final ↗
2026-09-10Solar & Storage32080 N 116TH LNSOLARAPP - INSTALLATION OF A 11.50 KW (AC) PV SYSTEM + 13.50 KW BATTERY INTEGRATED (APS)Final ↗
2026-09-03Solar & Storage12812 W CARAVEO PLSOLARAPP - INSTALLATION OF A 7.60 KW (AC) PV SYSTEM + BATTERIES STORAGEFinal ↗
2026-08-10Solar & Storage8401 W CHERRY HILLS DRSOLAR APP - INSTALLATION OF A 11.50 KW (AC) PV SYSTEM + 13.5 kw battery ENERGY STORAGE (APS)Final ↗
2026-08-06Solar & Storage10603 W RUTH AV5.33 (DC) PV SYSTEM, PW3/ESS 11.5KW (AC) W/ TESLA BACK UP SW. (APS)Final ↗
2026-08-06Electrical10603 W RUTH AVMPU FROM EXST (APPROX 125A) SPLIT BUSS TO 225A RATED 200A MSP (WATER/GAS BONDS SHALL BE COMPLIANT TO E3604.3 & E3608)Final ↗
2026-07-30Solar & Storage13020 W WHISPER ROCK TRSOLAR APP - INSTALLATION OF A 11.50 KW (AC) PV SYSTEM + ENERGY STORAGE 13.50 BATTERY KWH (APS)Final ↗
2026-07-30Solar & Storage7046 W COTTONTAIL LN4.40KW DC PV, 11.50 KW(AC) W/PW3-ESS, 13.5 KWH, GW3 W/100A EXST BLP (APS)Final ↗
2026-07-30Solar & Storage7150 W EL CORTEZ PLMPU TO 200A SES W/100A PARALLEL ENERGY SLOT. THE 200A MCB SHALL BE DE-RATED TO 175A FOR NEW PV SYSTEM, EXST PV TO M1 (SIEMENS MC4040S1200SC)Permit Issued ↗
2026-07-30Solar & Storage7150 W EL CORTEZ PLADD 4.92KW DC PV & PW3-ESS,11.5KW AC/13.5kWh TO GW3 W/125A BLP (APS) (Exst syst terminates at M1 @new MSP)Final ↗
2026-07-23Solar & Storage10049 W ANGELS LNSOLAR APP - Installation of a 7.60 KW (AC) PV System with 13.5 KW battery integrated + expansion unit (APS)Permit Issued ↗
2026-07-16Solar & Storage8540 W MISSION LNINSTALLATION OF BATTERY STORAGE 13.5 (APS)Final ↗
2026-07-16Solar & Storage8540 W MISSION LNMAIN PANEL UPGRADE TO 200A W/100A MAX PARALLEL ENERGY SLOT (EXISTING 60A PV BREAKER TO BE INSTALLED IN SOLAR SLOT) (Maintain the 150A MCB frFinal ↗
2026-07-16Solar & Storage29751 N 119TH LN4.10 KW (AC) PV SYST W/PW3-ESS 13.5 KWH (SET TO MAX 32A OUTPUT) & TESLA BACKUP SW(APS)Final ↗
2026-07-06Electrical7150 W EL CORTEZ PLInstallation of a 60A Tesla EV ChargerFinal ↗
2026-06-25Solar & Storage9158 W LUDLOW DRSOLAR APP - INSTALL A 7.79 KW (AC) PV SYSTEM + 13.5 KW BATTERY INTEGRATED (APS)Final ↗
2026-06-23Electrical29751 N 119TH LNInstallation of a 220A outlet for EV chargerFinal ↗
2026-05-28Solar & Storage13239 N 87TH DRSolar App - INSTALL 7.60 KW (AC) PV SYSTEM + 13.5 kw BATTERY INTEGRATED (SRP)Final ↗
2026-05-26Electrical7319 W DREYFUS DRDERATED FROM 200A TO NEW 150AFinal ↗
2026-05-26Solar & Storage7319 W DREYFUS DR6.15kW PV SYST W/PW3 (SET TO 7.6K) + PW3-ESS EXPANSION, GW3 & 50A BLP- SRPFinal ↗