Peoria › contractor

Verde Solar Power

3 permits on record in Peoria, 2026-07-08 to 2026-09-24

No open permits past 120 days on record

Pro keeps watching and emails you the moment one gets close.

Rank in Peoria

Trade30 days90 days12 months
Solar & Storageno permits#19 of 31 (1)#22 of 65 (3)

Permits per month, last 12 months

3 permits on record, all issued between 2026-07-08 and 2026-09-24. A month by month chart appears once activity spans three or more months.

Recent permits (3 of 3)
IssuedTradeAddressWorkStatus
2026-09-24Solar & Storage25818 N 68TH AVSOLARAPP - Install 22 Trina 420W modules + Install a Tesla Powerwall3 with whole home back up provided by Tesla Back up switchPermit Issued ↗
2026-07-16Solar & Storage9339 W DONALD DRSolar App - Install 34 Roof top 14.280 kWh PV Modules + 14.3kwh Battery back up system with critical loads panel - APSFinal ↗
2026-07-08Solar & Storage9339 W DONALD DRDerate 400A MCB - 200/200 to 200/175 (Derate done on primary breaker) (PV system on solar app)Final ↗