Peoria › contractor
Verde Solar Power
3 permits on record in Peoria, 2026-07-08 to 2026-09-24
No open permits past 120 days on record
Pro keeps watching and emails you the moment one gets close.
Rank in Peoria
| Trade | 30 days | 90 days | 12 months |
|---|---|---|---|
| Solar & Storage | no permits | #19 of 31 (1) | #22 of 65 (3) |
Permits per month, last 12 months
3 permits on record, all issued between 2026-07-08 and 2026-09-24. A month by month chart appears once activity spans three or more months.
Recent permits (3 of 3)
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-09-24 | Solar & Storage | 25818 N 68TH AV | SOLARAPP - Install 22 Trina 420W modules + Install a Tesla Powerwall3 with whole home back up provided by Tesla Back up switch | Permit Issued ↗ |
| 2026-07-16 | Solar & Storage | 9339 W DONALD DR | Solar App - Install 34 Roof top 14.280 kWh PV Modules + 14.3kwh Battery back up system with critical loads panel - APS | Final ↗ |
| 2026-07-08 | Solar & Storage | 9339 W DONALD DR | Derate 400A MCB - 200/200 to 200/175 (Derate done on primary breaker) (PV system on solar app) | Final ↗ |